Last Changed 7/5/2019
|
The first step for Our Cottage was to pour the foundation slab.
|
 |
3/19/19
A good sign the morning. Concrete trucks lined up waiting to pour.
And the foundation slab pour had started. |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
 |
 |
 |
The garage floor was the last step.
We stayed back to kept out of the way of the workers. |
|
click on images to enlarge |
|
|
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
3/25/19
The excitement for today is the lumber for our future Cottage arrived.
The first of three shipments.
|
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
3/26/19
The Cottage sewer system passed its test and so it was connected to
the main sewer lines. |
 |
3/26/19
The piles of lumber are starting to become Our Cottage. |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
 |
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
3/29/19
The roof is going up.
|
 |
 |
 |
 |
4/3/19
We know the construction is getting serious when the porta-potty
arrives. |
click on images to enlarge |
|
|
 |
Almost all the rafters are up
and the sheathing is started. |
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
4/4/19
Rafters are done. The front of the Cottage has taken shape.
The roof sheathing and tar paper are almost done. |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
 |
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
4/11/19
Today the delivery of Autoclav Aerated Concrete (AAC), also known as
Hebel, and the windows happened.
The AAC is two inches
of light concrete that is used to cover the outside of the Cottage. This AAC layer
has an R-Factor
of 4 and provides a great base for the stucco covering.
|
 |
These are sheets
of the AAC sheathing. |
 |
click on images to enlarge |
|
click on images to enlarge |
The first step is applying the layer of Tyvec moisture barrier to
the studs.
The shape of the front of the Cottage is becoming apparent.
|
 |
 |
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
One our additions
to the base plan was these transom windows located in the bathroom
and hallway to the garage.
We had hoped to put the same windows in the kitchen but there wasn't
wall space for the windows. Those will be mounted in the side
wall of the garage. |
 |
 |
The Cottage is
taking a new feel as the walls are covered. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
4/12/19
Almost all the shingles were installed today.
Also, most of the AAC sheathing has been installed.
The Cottage is really looking like a house. |
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
4/15/19
The AAC has been applied to the front columns.. |
 |
 |
4/15/19
The application of the stucco has started. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
By the end of the
day, about 2/3rds of one wall had the first coat.
Lots of works prepping the surface. |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
4/18/19
Almost all the AAC is installed.
More of the walls have the primary stucco layer.. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
4/22/19
With the exception of the windows on the end of the garage and the
one in the bathroom, all the AAC has been installed. |
 |
 |
Almost all the
installed AAC has had the primary coat of stucco applied.
|
 |
click on images to enlarge |
|
click on images to enlarge |
 |
4/25/19
Finally the Bathroom transom windows has been installed.
|
 |
The framing for
the transom windows in the garage have been done and the windows are
present to be installed.
|
 |
click on images to enlarge |
|
click on images to enlarge |
 |
The front of the
Cottage is basically done.
Waiting for the stone fascia to
applied where the white areas are. |
 |
 |
The
fascia stones have arrived.
The framing walk-thru was completed and we are ready for the foam
insulation. |
click on images to enlarge |
|
|
5/1/19
Today the AAC was finished around the remaining four transom
windows, The new AAC was coated with the primer and then the
whole cottage was covered with the second stage coat of the stucco.
|
 |
 |
 |
 |
5/2/19
Most of the stucco final coat has been applied.
Big conduit pipe attached to end of building and run though a trough
to where the electrical hookup will be. |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
Waiting on the stone facade. |
 |
 |
5/3/19
Painting of the exterior is done |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
5/3/19
The stone fascia has started |
|
 |
5/7/19
The stone fascia was finished today. |
|
click on images to enlarge |
|
|
 |
5/8/19
The curb cutting machine is here cutting the curb for our drive
access. Not quite done. |
 |
 |
5/9/19
The electrician came and installed the meter box and the power
connection for the AC external unit. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
5/13/19
The electrical conduit for the fiber optic internet was laid into
the trench with the electrical power feed.
Then the trench was filled in. |
 |
 |
5/15/19
The garage received its door today. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
5/21/19
Real excitement today with these trenches. They are for the
electric service and we have been waiting. |
 |
 |
5/24/19
A look from the cottage front.
You can almost see the base for the power transformer. |
 |
click on images to enlarge |
|
click on images to enlarge |
 |
Some of the
exterior lights.
|
 |
 |
5/31/19
The driveway has been framed.
The house number has been installed.
|
 |
click on images to enlarge |
|
click on images to enlarge |
 |
The electrical
transformer that feeds our Cottage has been installed.
|
 |
6/10/19
The patio extension slab was poured today..
|
click on images to enlarge |
|
|
 |
The driveway has
been poured
The driveway from the garage.
|
 |
 |
6/18/19
A
really big deal, the electric meter has been installed after a long
wait. Now many other installations can be done.
|
click on images to enlarge |
|
|
 |
The driveway has
been poured
The driveway from the garage.
|
 |
 |
6/22/19
The drip irrigation is being laid.
|
click on images to enlarge |
|
|
 |
The
gas line feed has been laid waiting for the meter.
|
 |
The
interface box for the fiber option internet connection has been
installed.
|
click on images to enlarge |
|
|
 |
7/5/19
The sod has been laid. Between the high heat and heavy rains, the grass looks a little weak.
The grass is already looking better with watering.
|
 |
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |
 |
The
exterior is about done..
|
 |
 |
 |
click on images to enlarge |
click on images to enlarge |
click on images to enlarge |