Today was the start of the sheetrock installation/
|
click on images to enlarge |
 |
The sheetrock being delivered. |
 |
The first step was to install the shower base and walls as the sheetrock is installed over a lip on the shower walls. |
click on images to enlarge |
 |
Mark is checking the hole for the shower regulator. |
 |
|
click on images to enlarge |
 |
|
click on images to enlarge |
 |
The coax patch panel with the patch cables to feed the satellite dish out to the power pole where it is connected to the trailer. |
 |
The sheetrock is installed. |
click on images to enlarge |
 |
|
 |
The trayed ceiling. |
click on images to enlarge |
 |
The laundry/storage room. |
 |
The bathroom with water resistant sheetrock. |