Last Changed 12/10/2009
|
The mudding of the sheetrock is done. Today the trim was installed by our contractor.
|
click on images to enlarge |
 |
But first we received the shipment of the porcelain floor tiles, cement, grout, and paint from Lowes. |
 |
It was a lot easier having the tiles delivered. We could have carried them in a couple of trips with the Jeep or on Red
Rover's bed, but that would have meant a lot of lifting on our part. |
click on images to enlarge |
 |
|
 |
The trim is installed. |
click on images to enlarge |
 |
|
click on images to enlarge |
 |
|
click on images to enlarge |