Since we will have the first Cottage in Phase 5 of Retama Village after the model, the Phase is currently just being prepared.

Retama Lot Build
11/9/19
This is ground zero.  The drainage system is one of the first things to go in.
Retama Lot Build
Retama Lot Build Retama Lot Build Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge
Retama Lot Build The next step is getting the road in.  Until the road is in and the fire department can get in, construction cannot start. Retama Lot Build
Retama Lot Build Retama Lot Build Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge

11/20/18
Retama Lot Build Retama Lot Build  Retama Lot Build

11/26/18
Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge
Retama Lot Build 12/17/18
Starting to put some crushed rock down.
 
Retama Lot Build 12/29/18
Looks like the curbing is being laid out.
 
click on images to enlarge
 
 
Retama Lot Build 12/30/18
The concrete curbs are started
Retama Lot Build

1/4/19
Curbing almost done
Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge
Retama Lot Build Retama Lot Build Retama Lot Build

1/8/2019
The curbing for the parking area on the side of our Cottage is in. The forms to pour the corner curbs are in.

Can't you envision the Cottage?
Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge

The next step is to pack down caliche between the curbs until a level is reached for the asphalt. Caliche is used because it is like a natural cement that makes a very hard and stable base.  It is found in the desert southwest and used here.

1/11/2019
The final curbing is being poured.  Forms have to be used for the corners as the curb machine can only do straight sections.

A concrete band is being poured across the road to provided a channel for rain water.

Now for some more caliche and asphalt.

Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
 
 
Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge
Retama Lot Build 1/21/19
A sign that say this is our lot
Retama Lot Build
Retama Lot Build 1/22/19
A relative sign that the road is coming.  The caliche has been spread out to almost level with the curbs.  The next step is asphalt.
Retama Lot Build
click on images to enlarge
click on images to enlarge
Retama Lot Build 1/24/19
The lot prep for the model Cottage has been started.

The caliche for the road is almost ready.
Retama Lot Build
Retama Lot Build On our lot, the location sticks have been placed. Retama Lot Build
click on images to enlarge
click on images to enlarge
Retama Lot Build 1/29/2019
The foundation slab for the model home is laid out.
 
Retama Lot Build 2/9/2019
There is oil on the caliche.  Next step the asphalt aggregate.
 
click on images to enlarge
Retama Lot Build 2/12/2019
Asphalt aggregate is being laid.
 
Retama Lot Build Retama Lot Build Retama Lot Build
click on images to enlarge
click on images to enlarge
click on images to enlarge
Retama Lot Build 3/2/2019
Major progress, our name on the sign post.

The gravel for the foundation has  been laid.
Retama Lot Build
Retama Lot Build 3/5/2019
The forms for the foundation slab are being built.
Retama Lot Build
click on images to enlarge
click on images to enlarge
Retama Lot Build 3/6/2019
The channels for the foundation and the plumbing have been cut.
Retama Lot Build
Retama Lot Build 3/8/2019
The laying of pipes that will be in the foundation slab are being laid.
Retama Lot Build
Retama Lot Build The channels for the foundation and the plumbing have been cut.

The ditching machine used to cut the channels.
Retama Lot Build
click on images to enlarge
click on images to enlarge
Retama Lot Build 3/12/19
The inspector says the plumbing is good.
 
Retama Lot Build 3/14/19
The foundation rebar is being formed.
Retama Lot Build
click on images to enlarge
click on images to enlarge
Retama Lot Build 3/15/19
The moisture barrier has been laid and the rebar forms are being put in place.
Retama Lot Build
Retama Lot Build 3/16/19
The rebar is done, waiting on an inspector,  The concrete company man says Monday should be the pour.
Retama Lot Build
click on images to enlarge
click on images to enlarge

And now to build Our Cottage.


Disclaimer: The information in this site is a collection of data we derived from the vendors and from our personal experiences.  This information is meant as a learning guide for you to  make your own decisions  Best practices and code should always be followed.  The recommendations we make are from our personal experiences and we do not receive any compensation for those recommendations.